Project Data
170Kw
Gap continuously filled by the storage system
1.9MWh
Capacity of the installed BESS.
200kWp
Integrated photovoltaic system with DC coupling
< 200ms
Backup response time in the event of a failure
The Challenge
The challenge wasn’t the electric vehicle itself, but everything surrounding it.
Technical Challenge
A fleet of 32 electric vehicles operating on back-to-back double shifts, with tight charging windows between shifts.
Network Constraint
Power available at the point of delivery (POD) is limited to just 60 kW.
Charging Needs
The need to ensure a constant 230 kW to charge vehicles simultaneously—nearly four times the power supplied by the grid.
Critical Risk
Every fleet shutdown results in unsustainable financial losses for last-mile delivery operations.
The Solution
Dogma has built an energy ecosystem managed by the CSMS, featuring peak shaving capabilities and real-time monitoring of the fleet’s charging status.
Architecture
The ecosystem is governed by the CSMS DOGMA, which primarily performs peak shaving and monitors the fleet’s charging status.
BESS System
We installed a storage system with an output of 250 kW and a massive capacity of 1,290 kWh. The vehicle is equipped with the very latest generation of 314Ah LFP cells, which provide significantly greater thermal stability than previous models and can withstand heavy charging cycles while minimizing degradation over time.
Photovoltaic Integration
A 200-kW peak (kWp) system operated in DC coupling.
Zero Downtime Dynamics
In response to a constant demand of 230 kW, the CSMS performs peak shaving: it draws a maximum of 60 kW from the grid and compensates for the remaining 170 kW by supplying continuous additional power from the BESS. In the event that severe weather drains the batteries or due to faults attributable to the BESS, the CSMS automatically starts a 250 kVA diesel generator in less than 200 milliseconds, preventing any fleet downtime.